Plymouth
The town’s climate dashboard reports 87% of buildings on septic in 2023. The Public Health tables and Laserfiche portal provide separate plan, permit and inspection records. Plymouth records by year
Town records and state guidance on septic use, permits, Title 5 failures, replacement costs and financing across the Lower South Shore.
Records compiled through
87%
Share of Plymouth buildings on septic systems in 2023. Plymouth Climate Action indicator
252
Septic plans reported by Plymouth Public Health in 2024. 2024 Town Report, pp. 487–489
66
Parcels with a failed Title 5 inspection in the 2025 portal records reviewed in November 2026. Plymouth public records search
| Record | 2023 | 2024 | 2025 |
|---|---|---|---|
| Septic plans in annual reports | 254 | 252 | Excluded |
| Title 5 inspection filings in annual reports | 394 | 374 | 400 |
| Parcels with a failed Title 5 report in the portal | 39 | 50 | 66 |
| Failed parcels with a permit on file from 2023–2026 | 33 | 43 | 51 |
| Digitized septic permit files in the portal | 201 | 203 | 216 |
| Percolation-test filings in annual reports | 146 | 185 | 134 |
Public Health tables: 2023 report, pp. 416–419, 2024 report, pp. 487–489, and 2025 report, pp. 473–474. Portal counts: Plymouth Laserfiche search.
Town report figures use the published Public Health categories. The November 2026 portal review counted septic permit files and deduplicated failed inspection reports by parcel. The annual filing and portal failure counts cover different sets of records, so a townwide failure rate cannot be calculated from this table. A permit matching a failed parcel shows both records are on file. The match alone cannot establish when repairs took place.
The 2025 plan figure was excluded because the published figure and the portal numbering could not be reconciled. A sequence number cannot establish how many permits were issued. The 2026 failure count is still incomplete because reports are scanned in batches.
Estimated. Among permit files whose scope could be read by automated text extraction, 10%–18% involved new construction in 2023–2025. About 45% of files could not be classified, so the share applies to the readable subset. A separate count for full replacements or leach-field-only jobs was unavailable in the records reviewed.
Compare full septic replacement, Title 5 repairs and upgrades, and new septic installation.
Each town publishes different records. Sewer connections, septic permits, and inspection failures describe different things. An unavailable count means the reviewed sources did not establish a figure.
The town’s climate dashboard reports 87% of buildings on septic in 2023. The Public Health tables and Laserfiche portal provide separate plan, permit and inspection records. Plymouth records by year
Kingston reported 1,618 properties connected to municipal sewer in October 2024. Its 2024 Town Report records two septic replacements through the Community Septic Management Program that year. Townwide septic share, septic construction permit totals and annual failure counts were unavailable. Sewer rates, Article 2 · 2024 Town Report, p. 57
Carver’s local rules specify at least 750 square feet of leaching area for homes with up to four bedrooms, plus 250 square feet per additional bedroom. Septic share and annual permit and failure totals were unavailable. Carver septic regulations, supplements to 310 CMR 15.251 and 15.253
The town’s 2024 housing plan says most of Duxbury relies on private septic and identifies Gurnet Road as the area served by Marshfield’s sewer system. A precise septic share and annual permit and failure totals were unavailable. Housing Production Plan, section 9
The Board of Health recorded 14 septic construction, upgrade or repair permits in 2023 and 20 in 2024, with 17 percolation-test applications each year. Septic share and annual Title 5 failures were unavailable. 2023 Town Report, p. 8 · 2024 Town Report, p. 10
EPA designated the 199-square-mile sand-and-gravel Plymouth-Carver aquifer a Sole Source Aquifer in 1990. It supplies drinking water to nearly all residents in its service area. The designation covers all of Plymouth, most of Carver, and substantial parts of Kingston and Plympton. Duxbury is outside the designated boundary. The Jones River in Kingston marks its northern edge. EPA designation notice, 55 FR 32137
The aquifer’s permeable soils make groundwater protection important. The location of wells, waterways and seasonal high groundwater can affect the design of a replacement soil absorption system. Local permit resources are listed on the service areas page.
These estimates come from 2026 private-market guides that report installer quotes. Actual quotes depend on the approved design, soil, groundwater, site access, and restoration.
About $20,000–$35,000
About $25,000–$45,000
About $30,000–$60,000+
About $10,000–$25,000
Estimated market prices from Mass Home Comfort, October 2026 review. Full replacement guide · Leach field cost guide
Eligible Massachusetts homeowners may claim 60% of qualifying costs up to $30,000 for an owner-occupied principal residence. The credit is capped at $4,000 per tax year and $18,000 per residential property under the rules effective for tax years beginning in 2023. From 2024, certain Title 5 or watershed-permit upgrades and sewer connections also qualify. Massachusetts DOR Schedule SC and instructions
Plymouth’s program offers eligible owners with documented failures loans of up to $35,000 at 5% for 5, 10 or 15 years, repaid through the property-tax bill. Kingston participates in the Old Colony Planning Council program. MassHousing offers low- or no-interest loans of up to $25,000 to qualifying households through participating lenders. Plymouth loan program · Old Colony program · MassHousing loan program
Plymouth reported 254 septic plans in 2023 and 252 in 2024. The portal review found 201 to 216 digitized septic permit files per year from 2023 through 2025. Most classifiable files involved existing systems, although about 45% could not be classified. The records reviewed did not establish a complete annual count of full replacements.
Massachusetts generally requires a Title 5 inspection within two years before a property sale. If weather prevents it, the inspection can occur up to six months after closing when the buyer receives written notice. Certain family transfers, refinances and other transactions are exempt. With documented annual pumping, a sale inspection can remain valid for three years.
The owner generally has two years to upgrade the system unless the local Board of Health or MassDEP authorizes a different schedule. The obligation still applies if the sale falls through. The Plymouth records review found 39, 50 and 66 parcels with failed inspection reports in 2023, 2024 and 2025, respectively. Most of those parcels also had a septic permit on file from 2023 through 2026.
EPA’s homebuyer guide gives a typical lifespan of 15 to 40 years and says a well-maintained system can last longer. EPA’s current maintenance FAQ recommends inspection every one to three years and pumping every three to five years, depending on the system and household.
A 2026 guide reports installer-quoted estimates of about $20,000–$35,000 for conventional systems, $25,000–$45,000 for mound systems, and $30,000–$60,000 or more for nitrogen-reducing systems. A separate guide estimates about $10,000–$25,000 for a leach-field-only replacement. These market estimates vary with site conditions and the approved scope.
Eligible owners may claim 60% of qualifying costs up to $30,000 for their Massachusetts principal residence. The Schedule SC credit is limited to $4,000 per tax year and $18,000 per residential property. Unused credit can carry forward for five tax years after the initial claim. Starting in 2024, certain required upgrades and sewer connections also qualify.
Eligible Plymouth homeowners with documented failures can apply for up to $35,000 at 5%, payable over 5, 10 or 15 years through the property-tax bill. Kingston participates in Old Colony Planning Council’s program. MassHousing offers qualifying households up to $25,000. Local betterment loan availability in Carver, Duxbury and Plympton was not confirmed.
A leach field is the soil absorption area where septic effluent disperses. A failed field is ineligible for a conditional pass under Title 5. It may be possible to replace the field and retain a suitable tank if the local Board of Health approves the design and scope. Confirm testing, design and permit requirements with the town before construction.
All four towns have properties with onsite septic. Kingston reported 1,618 sewer-connected properties in 2024. Duxbury’s housing plan says most of the town relies on private septic. Plympton reported 14 septic construction, upgrade or repair permits in 2023 and 20 in 2024. Carver publishes septic design rules. The records reviewed did not establish official septic percentages for these towns.
EPA designated the Plymouth-Carver aquifer in 1990 as a sole source of drinking water for its service area. The highly permeable sand and gravel extend across Plymouth and parts of Carver, Kingston and Plympton. Duxbury is outside the designation. Seasonal groundwater and proximity to wells and waterways can affect where a septic field can go.
A cesspool collects solids and disperses liquid in a single pit. Under statewide Title 5 rules, ordinary residential cesspools fail when they meet inspection criteria involving factors such as liquid level, groundwater, pumping frequency or proximity to drinking water supplies. Cesspools are ineligible for a conditional pass. State rules treat large-capacity cesspools separately, and towns can be stricter. Duxbury requires an upgrade for certain major additions, and Carver treats cesspools as failing in Title 5 inspections.